Current works
Widening Tweed Coast Road Flood restoration – roads Upcoming planned works Map of works
Stay up to date with what's happening on our roads, follow us on Facebook or visit Live Traffic NSW.
To learn more about how we build, upgrade and maintain a safe and connected local road network, including how we prioritise road maintenance projects, visit our roads page.
Information on this page is intended as a guide. Start and end dates are estimates only and may change for various reasons including weather conditions.
Last updated on Tuesday 8 September 2026.
Council inspected the downslope slip soon after ex‑Cyclone Alfred. Water‑filled barriers were placed along the road shoulders to reduce the immediate risk to drivers.
On advice from a geotechnical consultant, Council has moved traffic lanes away from the slip by narrowing and adjusting the road layout. Because of this, the speed limit is now 40 km/h. These temporary changes will stay in place until full restoration work is finished.
Council is now undertaking design and investigation works to stabilise the slip and begin permanent repairs.
Easement closed
Where:
Towners Avenue Pump Station, Easement behind Poinciana Avenue, crossing Ti Tree Avenue, to Cabarita Road, Bogangar
What’s happening:
Schedule:
- Work starts Wednesday 26 August until early December 2026
- All roadworks are weather dependant, if wet weather delays works, return to this page for updates.
Work hours: Night works
Impacts:
- Areas within Poinciana Avenue easement and Ti Tree Avenue easement will be barricaded off, preventing public access.
- No pedestrian access via the easement during construction. Pedestrians will be directed to use Poinciana Avenue/ Ti Tree Avenue/ Hastings Road/Towners Avenue
- When crews trench across Ti Tree Avenue, they will close half the road and work to the centreline before switching traffic and working from the centreline to the shoulder of the road. At these times, two-way traffic flow will be directed through one side of the road.
What’s happening:
- Road repair works by National Parks & Wildlife Services
Schedule:
- Road closed from 8am Monday 22 June to 2026 until further notice
- pending weather, the operational period may be extended
Impacts:
Stormwater upgrades have been completed along Hunter Street, near the Dignan Street intersection, to reduce flooding and improve drainage. As part of the environmental restoration, native vegetation – including threatened species – has been replanted and the site is under ongoing maintenance. Temporary fencing and signage are in place and there is no pedestrian access through the restoration area.
Bridge repairs to the bridge over Tweed Valley Way south of Broadway Lane ongoing. Awaiting structural engineer's report.
Byrrill Creek Road will be reduced to one lane, including outside work hours.
Temporary lane closures may be required at times causing delays of up to 15 minutes.
Traffic lights will be in place to manage traffic for the entire duration of the works, including after hours.
Work hours are Monday to Friday, 7 am to 5 pm. Works may need to be conducted some Saturdays, between 7 am to 1 pm.
Temporary road closure:
- Byrrill Creek Road will be fully closed between 9 am and 3 pm for 4 days from Tuesday 22 September to Friday 25 September 2026.
- No vehicles will be able to pass through the work site during these closure times.
- The closure is needed for tree removal, installation of a new pipe across the road, and construction work on the existing gabion wall.
- Residents west of the work site will need to use an alternative route via Tyalgum.
- We've made plans for emergency vehicles to pass through the site.
- Pedestrian movement may be directed or restricted.
- Large earthmoving machinery. Some construction noise and dust. Minor ground vibrations.
Final concrete poured Byrrill Creek Bridge
The 4-lane upgrade of 6.1 km of Tweed Coast Road, has an estimated roadworks cost of $79 million. The project will be delivered in 6 sections with the widening of sections 5 & 6, from the M1 roundabout at Chinderah to the Cudgen Road, Cudgen now underway. Preliminary work to identify services and tree clearing along the route has been completed.
Where:
Clothiers Creek Road, from the M1 to Eviron Road, Nunderi
What’s happening:
Schedule:
- Works start Wednesday 23 September 2026 for around 1 week
Work hours:
Impacts:
- Slow moving vehicles
- Reduced speed in work area
- Occasional changed traffic conditions with traffic controllers guiding traffic flow during work hours.
- Pedestrian may be guided through works area
60% of soil nails installed
Slip repair works. Monday to Friday, 7 am to 5 pm. Works may need to be conducted some Saturdays, between 7 am to 1 pm. Traffic control will be in place with one-way alternate flow. Delays of up to 20 minutes.
Slip repair works. Traffic control will be in place with one-way alternate flow. Work hours are Monday to Friday, 7 am to 5 pm. Works may need to be conducted some Saturdays, between 7 am to 1 pm.
Slip repair works. Traffic control will be in place with one-way alternate flow. Work hours are Monday to Friday, 7 am to 5 pm. Works may need to be conducted some Saturdays, between 7 am to 1 pm.
Slip repair works. Traffic control will be in place with one-way alternate flow. Work hours are Monday to Friday, 7 am to 5 pm. Works may need to be conducted some Saturdays, between 7 am to 1 pm.
Installation of soil nails underway
Slip repair works. Traffic control will be in place with one-way alternate flow. Work hours are Monday to Friday, 7 am to 5 pm. Works may need to be conducted some Saturdays, between 7 am to 1 pm.
Slip repair works are planned for the site. Traffic control will be in place with one-way alternate flow. Work hours are Monday to Friday, 7 am to 5 pm. Works may need to be conducted some Saturdays, between 7 am to 1 pm.
One lane is closed 24 hours a day due to the downslope slip in this location. Portable traffic lights in place. Repair works are pending NSW Reconstruction Authority (RA) funding approval.
Murwillumbah Cycle Club hosts fortnightly road races for cyclists. Two road racing courses, Eungella (Tyalgum Road) and Dulguigan (Dulguigan Road, Boyds Lane and Urliup Road, are used alternatively. Details at facebook.com/MurbahCycleClub.
Sewer Rising Main Upgrade
Glough Way and Moss Street
What’s happening:
- Sewer Rising Main Upgrade - Glough Way
Schedule:
- Monday 28 September 2026 for about 6 weeks
Work hours:
- Monday–Friday, 7 am–5 pm
- Some Saturdays, 7 am–5 pm
- Linemarking will occur at night towards the end of the project
Impacts:
- Road Closure between Moss Street and Sunrise cove Apartments and Sutherland Street, detours will be in place, under traffic control during work hours.
- No street parking during work hours
- No pedestrian access through the work site.
Alternative routes:
- Use alternative routes where possible.
One lane is closed 24 hours a day due to the downslope slip in this location. Repair works are pending NSW Reconstruction Authority (RA) funding approval.
Geotechnical investigation works, including borehole drilling. Road closed Thursday 1 October and Friday 2 October 2026 between 9 am and 3 pm. No through‑traffic during those times.
Slip repair works. Traffic control will be in place with one-way alternate flow. Work hours are Monday to Friday, 7 am to 5 pm. Works may need to be conducted some Saturdays, between 7 am to 1 pm.
Road closed
Where:
Mooball Lane, between Mooball street and Ewing Street, Murwillumbah
What’s happening:
- Excavation and removal of the existing road pavement
- Import, placement and compaction of new gravel material
- applying bitumen seal, which needs 3 to 5 days to cure before the final step of applying an asphalt surface
Schedule:
- mid-September 2026 for about 3 weeks, weather permitting
- All roadworks are weather dependant, if wet weather delays works, return to this page for updates.
Work hours:
Impacts:
- Mooball Lane Lane closed during work hours.
- Local resident access only
- Limited access to some properties and driveways within the work zone during work hours. Please ask the traffic controller for help if you need access.
- Changed traffic conditions with traffic controllers guiding traffic flow during work hours.
Tree planting
What’s happening:
- removal of old concrete tree bases
- installation of new base system
- planting of new trees (Tristaniopsis Luscious aka Watergums)
- installing new permeable paving
- reinstate parking asphalt
- linemarking
Schedule:
- Works start Monday 7 September 2026 for around 16 weeks
Work hours:
Impacts:
- Reduced parking within the works area
- Occasional changed traffic conditions with traffic controllers guiding traffic flow during work hours.
- Pedestrian may be guided through works area
- no reduced access to businesses along Murwillumbah Street.
Bridgeworks
Wollumbin Street, Murwillumbah
What’s happening:
- bridge cleaning and repairs of concrete piers under the bridge
-
generally, work will be carried out under the bridge. The project team will access the piers via boat from a temporary pontoon.
-
installing protective system onto concrete piers to prevent damage and corrosion.
-
Schedule:
- River Street carpark closed to public from Monday 20 April for duration of the project
- Works to bridge begin on Monday 4th May for around six months
Work hours:
- Monday–Friday, 7 am – 6 pm
- Some Saturdays, 8 am – 1 pm
Impacts:
-
At times, there will be single lane, alternating traffic flow arrangements and a reduced speed limit of 40km/h will be in place when carrying out work from the bridge deck.
-
At these times motorists should allow up to 10 minutes extra travel time.
-
Please keep to the speed limits and follow the direction of traffic controllers and signs.
Project update Wednesday 23 September 2026
- all works on the road formation have now finished
- line marking will be completed next week
- rock armour works and landscaping complete
- final works on the river side of the embankment are underway
- traffic will still be down to one lane whilst completion works are carried out.
The works are now complete, but the newly seeded areas need some time to recover. Please help us protect the new landscaping by not parking on these areas while the grass grows back.
The Blacks Drain upgrade on Tweed Valley Way in South Murwillumbah is a $2.56 million project to restore and strengthen the road after it was badly damaged in the 2017 and 2022 floods. A temporary repair was put in place after those events, and work is now starting on a permanent, flood‑resilient solution.
From 15 June 2026 site setup and surveying will take place with traffic reduced to one lane from early July 2026. The project will take about 20 weeks, weather permitting.
Work hours are Monday to Saturday, 7 am to 6 pm. Works may need to be conducted some Saturdays, between 7 am to 1 pm.
Traffic changes during works
-
Tweed Valley Way at Blacks Drain will be reduced to one lane counterflow traffic during the works
-
please allow additional time to pass through the works, especially during morning and afternoon peak periods
-
traffic will be managed under traffic lights and/or traffic controllers
-
temporary road closures during work hours will be required and may cause delays of up to 10 minutes.
-
please do not use on-street parking within the work area
-
limited access to some properties and driveways within the work zone during work hours
-
Rose Lane access will be restricted with limited local access only through this period
-
please ask the traffic controller for help if you need access
-
pedestrian movement may be restricted with no pedestrian access through the work site.
Once complete, the upgrade will provide a safer, stronger and more resilient road that can better withstand future weather events.
Changed traffic conditions on Tweed Valley Way, south of Murwillumbah due to stability issues.
The slow lane is partially closed to protect road users from a possible site slip. Repair works are pending NSW Reconstruction Authority (RA) funding approval.
- installing suitability anchors on 9 September and 10 September 2026
- suitability testing planned for 28 September and 29 September 2026
- slip repair works commence from 6 October 2026, weather permitting
- traffic control in place with one-way alternate flow
- work hours are Monday to Friday, 7 am to 5 pm. Works may need to be conducted some Saturdays, between 7 am to 1 pm.
Planned environmental investigations and associated planning works are scheduled for land between Amaroo Drive intersection, Banora Point and Ossa Boulevarde and Zeil Place, Terranora.
Tweed Coast Road, between Cudgen traffic lights and Kings Forrest roundabout
What’s happening:
- Stormwater drainage works
Schedule:
- Wednesday 16 - Friday 18 September 2026, weather permitting. If weather delays this project, check back here for the updated schedule
Work hours:
Impacts:
- Temporary road and lane closures during work hours, which may cause delays of up to 5 minutes
- Limited access to some properties and driveways within the work zone during work hours. Please ask the traffic controller for help if you need access.
- Changed traffic conditions with traffic controllers guiding traffic flow during work hours.
Water main upgrade. - Night asphalt works
Where: Ducat Street, Tweed Heads
When: Monday 14 - Thursday 17 September 2026
What time: Work hours 7 pm - 6 am
What to expect:
- Temporary lane closures during work hours, expect delays of up to 5 minutes.
- Limited access to some properties and driveways within the work zone during work hours.
- When crews trench across Ourimbah Rd, Kennedy Drive and Flamingo Place they will close half the road
- When crews trench across Jalibah Avenue, Parkes Drive, Compass Way & Caloola Drive, the road will be closed. Please follow safety signs and message boards.
- Ducat Street Park car park will be closed during the project.
- Please do not use on-street parking during work hours.
- Changed traffic conditions with traffic controllers guiding traffic flow during work hours.
Drainage upgrade
What’s happening:
- new drainage - kerbs and driveway crossovers
Schedule:
Work hours:
Impacts:
- Temporary single lane closures will be in place during work hours
- Changed traffic conditions with traffic controllers guiding traffic flow during work hours.
- Pedestrian movement may be directed or restricted.
- Linemarking will take place at night towards the end of the project.
Road rejuvenation
What’s happening:
What's planned:
- Road treatment to delay deterioration of the asphalt surface, keeping roads in optimum condition
Schedule:
Work hours:
Impacts:
- Temporary single lane closures will be in place during work hours
- Changed traffic conditions with traffic controllers guiding traffic flow during work hours.
- Pedestrian movement may be directed or restricted.
- Linemarking will take place at night towards the end of the project.
Why were these works delayed?
We want to let you know that work to rejuvenate Piggabeen Road has been delayed because of unseasonably wet weather.
The road treatment we planned to use is a specialised 2-coat spray seal that can only be applied in warm weather. It was chosen because it gives the best long-term result for Piggabeen Road. Our aim was to complete this work in early May, but the heavy and ongoing rain has pushed us into the colder months. Because of this, we now need to wait until Spring 2026 to return and complete the seal.
We know many residents and road users rely on Piggabeen Road every day, and we want you to know that we genuinely care about both your safety and the condition of the road. We understand how important this route is to your daily life, and we share your frustration about the delay. Our goal is to deliver a long-lasting, high-quality result, and waiting for the right weather conditions is the best way to make sure the work is done properly.
We understand this delay is frustrating. Please know that Piggabeen Road remains a priority for Council.
Maintaining our road network is a big job. Our crews work year-round to look after about 1,200 km of roads across the Tweed. We plan our programs carefully, but the weather is the one thing we can’t control.
Slip repair works. Traffic control will be in place with one-way alternate flow. Work hours are Monday to Friday, 7 am to 5 pm. Works may need to be conducted some Saturdays, between 7 am to 1 pm.
Slip repair works. Monday to Friday, 7 am to 5 pm. Works may need to be conducted some Saturdays, between 7 am to 1 pm. Traffic control will be in place with one-way alternate flow. Temporary road closures during work hours may be required at times and cause delays of up to 10 minutes.
Slip repair works. Monday to Friday, 7 am to 5 pm. Works may need to be conducted some Saturdays, between 7 am to 1 pm. Traffic control will be in place with one-way alternate flow. Temporary road closures during work hours may be required at times and cause delays of up to 10 minutes.
Slip repair works. Monday to Friday, 7 am to 5 pm. Works may need to be conducted some Saturdays, between 7 am to 1 pm. Traffic control will be in place with one-way alternate flow. Temporary road closures during work hours may be required at times and cause delays of up to 10 minutes.
Wooyung Road, near the Honey Shack
What’s happening:
- Profiling out current road pavement, placement of deep lift asphalt and wearing surface asphalt
- Reinstallation of precast traffic islands
- Linemarking
Schedule:
- Until the end of August 2026, weather permitting
Work hours:
Impacts:
- Temporary road and lane closures for the duration of the works, which may cause delays of up to 5 minutes
- Limited access to some properties and driveways within the work zone during work hours. Please ask the traffic controller for help if you need access.
- Changed traffic conditions with traffic controllers guiding traffic flow during work hours.
- No pedestrian access through the work site.