Tumbulgum Hall upgrade

Tumbulgum Hall

We upgraded the community hall in Tumbulgum to enhance its resilience. The renovation included flood-resistant materials and design elements to reduce the impact of future flood events.

Following the upgrade, Tumbulgum Hall is now a safe and inclusive space for gatherings, events, and activities for years to come.

Project schedule

  • Planning: Early 2025
  • Construction: Project completed August 2025   

Works included

  • Replaced damaged sheeting on the front façade
  • Installed new timber-framed sash windows with metal hoods on the front façade
  • Added window hoods to all southern windows and over the rear door
  • Repaired and replaced damaged window frames and sills
  • Replaced the roof and gutters, connecting them to a stormwater collection point away from the building, and added whirly birds
  • Repaired or replaced damaged or rotted timber chamfer boards, fascia, and trims with matching profiles
  • Prepared and repainted internal and external surfaces using the heritage paint colour scheme
  • Replaced the rear stairs, extended the landing, and relocated the main switchboard with provisions for a generator attachment
  • Poured a new slab under the rear stairs and added an enclosed bin storage area
  • Inspected and re-stumped the building as required
  • Repaired or replaced all doors and reinstated original hardware
  • Cleaned and repaired kitchen grout

How it’s getting done

Jointly funded by the Australian and NSW Governments.